Not a builder, renovator, or showroom. Independent WWB fleet guide — verify licences, NCC/VBA rules, and quotes with qualified trades.

UltimateKitchens & bathroomsWrite the brief
Warm stone and timber Melbourne kitchen with nickel fittings

Melbourne · stone, timber, chrome

How do Melburnians plan a kitchen or bathroom renovation?

Design, waterproofing, and cost framing with the assumptions still attached — for occupied houses from Brunswick terraces to bayside villas.

At a glance

Scope

Kitchens and wet rooms in occupied Melbourne houses

First risk

Waterproofing and falls — not tap finish

Cost stance

Planning bands only, assumptions published

Not this site

No quotes, no #1 claims, no historic showroom

The brief

Design, waterproofing, and cost framing — in that order

Three ways in

A weekend brief, a wet-area week, or a twelve-week gut

Limestone bathroom with chrome rail and timber vanity

Bathroom ledger

Waterproofing before pretty

Melbourne bathrooms fail inspections on membranes, falls, and penetrations — not on tap finish. Read the wet-area basics, then decide shower versus bath with the room you actually own. Heritage bathroom designs sit next to a Melbourne process page, not a ranking claim.

Kitchen ledger

Layout, duct, then walnut

The working Melbourne kitchen is a services problem first: rangehood duct, dishwasher waste, oven circuits, and an aisle you can still pass when two doors open. Then it is a materials problem — see choosing benchtops and the kitchen hub.

Smoked walnut kitchen with stone bench and nickel tap

Also on the map

Waterproofing, designs that age, and suburb notes

Evergreen

Guides that stay useful after handover

All guides →

FAQ

What visitors always ask

Is this Ultimate Kitchens & Bathrooms still a Hawthorn contractor?

No. This domain is now an independent WWB fleet editorial guide. It is not a builder, not a showroom, and not a successor to any historic Hawthorn East licence or display home.

How much does a bathroom renovation cost in Melbourne?

There is no honest fixed price. Use the planning bands on /bathroom-renovation-cost/ — they change with footprint, whether plumbing moves, and whether the membrane is a full redo. Those numbers are not quotes.

Kitchen or bathroom first?

If only one room can be out of action, renovate the bathroom first when waterproofing risk is higher; renovate the kitchen first when the household cannot lose the cook line. See /guides/planning-a-reno/.

Do I need a building permit in Victoria?

Sometimes. Same-footprint cosmetic work may not; structural changes, some wet-area rebuilds, and work affecting exits often do. Confirm the current trigger with the relevant building surveyor and the VBA — do not treat this site as a permit desk.

Internal ledger

Keep reading

Next step

Make a Melbourne renovation day of it

Pair the cost-guide assumptions with the checklist, then take a written brief to a licensed trade. We do not quote, design, or install.